# Onshore Gas Lift Piping Network Installation and Connection Support

![Industrial landscape image]()

36 km dual 4-inch underground RTP piping network

Location: Saudi Arabia 

Operator: Confidential 

Duration: 2024 

Scope: Piping network installation and well connection for gas lift operations 

We provided detailed engineering services for the design and installation of a 36 km dual 4-inch underground RTP piping network for a Gas Lift Ring. Our expertise ensured the seamless connection of 12 manifolds and 14 wells to the Gas Lift Ring, which links to an existing Gas and Oil Separation Plant (GOSP) through a designated manifold, optimising gas lift operations.

Scope:

- Installation of a 36 km dual 4-inch underground RTP piping network
- Connection of 12 manifolds to the Gas Lift Ring
- Integration of 14 wells into the Gas Lift Ring
- Connection of the Gas Lift Ring to the GOSP via a designated manifold