---
title: "Integrated Gas & LNG"
date: 2022-02-03T15:07:00+00:00
author: "development@madebyshape.co.uk"
canonical_url: "https://kent.nzi.me/what-we-deliver/our-markets/low-carbon-and-renewable-energies"
section: Page
---
Our Markets

## Integrated Gas &amp; LNG

As the world electrifies and renewables build scale to support global demand, the need for reliable, non-intermittent, cost competitive, globally mobile energy sources is critical. Gas is a key bridging fuel, and it will play a critical role in providing a stable, secure energy supply for a successful transition to a lower carbon world.

![LNG]()

## Gas is the key bridging fuel of the transition

Gas has the lowest carbon profile of hydrocarbons. It does not have the safety risks of nuclear and it has the mobility that hydro based power lacks. The primary chemical component of gas is methane which burns easily - and almost completely - leaving measurably less pollution.

However, pre-combustion methane leaks are an environmental hazard and that is why the COP 26 Global Methane pledge aims to cut emissions by 30% by 2030.

## We love challenge!

Kent has a legacy of delivering gas in a responsible manner and we will continue to do so. Across Asia Pacific, Middle East and the Americas, in environments ranging from -40°C to 40°C degrees, we have played a key role in executing some of the industry’s most successful projects. In Australia we have supported 7 of the 9 major LNG projects including Gorgon, Ichthys and Wheatstone LNG projects. In Russia, we executed and commissioned Sakhalin II LNG and in the USA, we assisted in commissioning a large LNG plant in Louisiana.

 In Qatar, we helped Qatar Energies construct and commission multiple LNG trains while also helping to reduce their flaring by more than 90% with the execution of the JBOG program removing more than 1.6million tonnes of emissions per year.

Here are some highlights of how many executed work hours the Kent team has performed on major projects:-

![Project gorgon lng trains large]()

120+m

Global LNG construction

30+m

Sakhalin I &amp; II

27+m

Gorgon LNG

22+m

Ichthys Project

20+m

Shell Qatar Pearl

![Sakhalin II Project]()

## Our expertise

We understand that no two projects are the same, which is why our flexible approach and tailored solutions deliver optimum results and best for project outcome. Skilled in all aspects of engineering and construction from mechanical, electrical &amp; instrumentation, structural, naval architecture, geotechnical, safety, reliability and environmental engineering our capabilities include:

Marine infrastructure

Liquefaction plant build

Gas processing and handling

Pipelines and compressor stations

Re-gasification and receiving terminals

Telecommunications

Non-process infrastructure

Off-sites and utilities

![Project Ichthys LNG]()

## Together, we deliver

### Front end advisory (FEL 0-3)

- Front End Design
- Feasibility studies and conceptual design
- Site evaluation and selection studies
- Technology evaluation &amp; selection (including evaluation of emerging technologies)
- Assess the commercial and technological risks of projects including project execution risk assessment for brownfield and green field facilities
- Guide developers through the government approval process including consenting, permitting and advisory services
- Strategies for optimizing greenfield layouts and brownfield layout integration with existing facilities and site constraints
- Preparations of CAPEX and OPEX cost estimates for FID based on our “as-built” experience

### Engineering &amp; delivery phase

- Detailed engineering including structural, process, mechanical, electrical, control &amp; instrument, safety
- PMC, owners engineering, EPCM and project management services
- Construction and commissioning activities
- Fabrication yard supervision as required

### Operations &amp; maintenance phase

- Advisory services
- O&amp;M execution
- Operator training programs

## Our Gas &amp; LNG Project Experience

[![Project gorgon plant site]()

Gorgon LNG Project](https://kent.nzi.me/gorgon-lng-project)

[![Project Ichthys LNG]()

Ichthys LNG, Australia](https://kent.nzi.me/ichthys-lng-australia)

[![Projects South Hook]()

South Hook LNG Terminal Upgrade](https://kent.nzi.me/south-hook-lng-terminal-upgrade)

[![Project Scarborough FPU]()

Scarborough Floating Production Unit](https://kent.nzi.me/scarborough-floating-production-unit)

[![Project Qatar Maintenance]()

Qatar Shell Pearl GTL: O&amp;M](https://kent.nzi.me/qatar-shell-pearl-gtl)

[![Project TAP 1]()

Trans Adriatic Pipeline Project](https://kent.nzi.me/trans-adriatic-pipeline-project)

[![Project West Nile Delta]()

West Nile Delta Project, Egypt](https://kent.nzi.me/west-nile-delta-project-egypt)

[![Project Shah Deniz 2]()

Shah Deniz 2 &amp; South Caucasus Pipeline](https://kent.nzi.me/shah-deniz-2-south-caucasus-pipeline)

[![PDO Training]()

Commissioning Support: Petroleum Development Oman](https://kent.nzi.me/commissioning-support-petroleum-development-oman)

[![APAC 0026 22919 QGC]()

QGC Upstream](https://kent.nzi.me/qgc-upstream)

[![Sakhalin II Project]()

Sakhalin-2 LNG Plant &amp; Oil Export Terminal](https://kent.nzi.me/sakhalin-2-lng-plant-oil-export-terminal)

[![Świnoujście Terminal LNG gazoport fotopolska eu 337768]()

Polskie LNG Terminal](https://kent.nzi.me/polskie-lng-terminal)

[![Gorgon barrow]()

Gorgon LNG Telecommunications &amp; Electronic Systems](https://kent.nzi.me/gorgon-lng-telecommunications-electronic-systems)

[![Gorgon Construction Village]()

Gorgon LNG Construction Village](https://kent.nzi.me/gorgon-lng-construction-village)

[![Hides 1920x1080 A]()

Hides Gas Conditioning Plant, Temporary Construction Village](https://kent.nzi.me/hides-gas-conditioning-plant-temporary-construction-village)

[![Jetty Boil Off Qatar gas]()

Jetty Boil-Off Gas Recovery Project (JBOG)](https://kent.nzi.me/jetty-boil-off-gas-recovery-project-jbog)

[![Projects 2023 2]()

Maharaja Lela Jamalul Alam Compression Project](https://kent.nzi.me/maharaja-lela-jamalul-alam-compression-project)

[![Projects 2023]()

New Gas Pipeline in the Northern Emirates](https://kent.nzi.me/new-gas-pipeline-in-the-northern-emirates)

[![Hydrogen]()

Global Framework Agreement with OMV](https://kent.nzi.me/global-framework-agreement-omv)

[![Saint John]()

Saint-John Boil-Off Gas (BOG) Liquefaction Facility](https://kent.nzi.me/saint-john-boil-off-gas-bog-liquefaction-facility)

[![Engineer in a platform]()

GOSPs Optimisation for Long-Term Sustainable Crude Oil Production](https://kent.nzi.me/gosps-optimisation-for-long-term-sustainable-crude-oil-production)

[![Pipe structure]()

Ethane Facility Upgrade – Pipeline and System Integration](https://kent.nzi.me/ethane-facility-upgrade-pipeline-and-system-integration)

[![Kent energy abstract]()

EPC services to enhance unconventional gas production](https://kent.nzi.me/epc-services-to-enhance-unconventional-gas-production)

[![Plant aerial]()

Commissioning and maintenance services for an IGCC plant](https://kent.nzi.me/commissioning-and-maintenance-services-for-an-igcc-plant)

[](#)[](#)
